E101-S Belt Scraper

APPLICATIONS:

FEATURES:

E101-S Scraper Parts Diagram

E 101-S SCRAPER - PARTS LIST - REF. DRG. BS 014-A

PART
NO.
ITEM   CODE
1 Carrier Assembly Size 1
Size 2
Size 3
Size 4
2/8.1.1
2/8.1.2
2/8.1.3
2/8.1.4
2 60°SS ' V' Track   2/9.3
3 Blade PU 120mm   2/7.7
5 End Stop   R-End Stop
6 Mounting Spindle Size 1
Size 2
Size 3
Size 4
2/1.1
2/1.2
2/1.3
2/1.4
7 Standard Square Mounting Size 1
Size 2
Size 3
Size 4
2/3.1
2/3.2
2/3.3
2/3.4
9 Optional 3 piece carrier shaft Size 1
Size 2
Size 3
Size 4
2/8.1.1/3P
2/8.1.2/3P
2/8.1.3/3P
2/8.1.4/3P
10 Optional Offset Plate Size 1&2
Size 3
Size 4
2/8.1.20
2/8.1.22
2/8.1.23

NOTE! Always quote scraper belt width.

E101-S SCRAPER - ASSEMBLY INSTRUCTIONS

  1. Referring to the parts list check that the correct parts and quantities have been supplied for the model and belt width of scraper ordered.
  2. Normally scrapers are supplied with Blades (3) and Stoppers (5) assembled on the Carrier Shaft. If this is not the case, assemble these components as shown. Do not over-tighten stopper Set Screws. If necessary use a rubber mallet to tap the blades into position.
  3. Depending upon the installation access (see Installation Guide paragraph 1) one or both of the carrier shaft end pieces (3 piece shaft) may now be attached. Check whether the optional off-set plates are to be used and if so ensure that they are correctly assembled. Ensure that all nuts and bolts are firmly fastened.
  4. Remove the clamp plates from the square mounts (7).
  5. Check that lock nuts move freely on spindle.
  6. Proceed with installation as per installation guide.

E 101-S SCRAPER - STANDARD MOUNT - INSTALLATION GUIDE - REF. DRG BS 017-B

DIMENSION TABLE

Belt
Width
Size
Code
No. of
Blades
A B Max
C1
Min
C1
Max
C2
Max
C3
D W Y Z
400 Size 1 3 62 70 295 225 95 -40 31 88 35 1200
450 Size 1 3 62 70 295 225 95 -40 31 88 35 1200
500 Size 1 4 62 70 295 225 95 -40 31 88 35 1200
600 Size 2 5 70 100 295 240 95 -40 31 88 50 1500
750 Size 2 6 70 100 295 240 95 -40 31 88 50 1500
900 Size 3 7 95 100 395 265 100 60 38 104 50 2000
1050 Size 3 8 95 100 395 265 100 60 38 104 50 2000
1200 Size 3 9 95 100 395 265 100 60 38 104 50 2000
1350 Size 4 11 110 130 450 320 15 150 40 136 60 3000
1500 Size 4 12 110 130 450 320 15 150 40 136 60 3000
1650 Size 4 13 110 130 450 330 15 150 40 136 60 3000
1800 Size 4 14 110 130 450 320 15 150 40 136 60 3000
2100 Size 4 17 110 130 450 320 15 150 40 136 60 3000

INSTALLATION INSTRUCTIONS

  1. Refer to the Assembly Instructions, Parts List and Drg BS 014 to confirm that all the necessary parts have been supplied and that the scraper is correctly assembled. Depending upon access space it may be necessary to use an optional 3 piece carrier. Then attach one or both of the Carrier Shaft End Pieces once the scraper is in position.
  2. Referring to the dimensions given in the table above select the optimum position for the scraper and mark the location of the access apertures.
  3. With reference to Drgs overleaf select the most convenient location for the mounting spindle. There are four possible positions but in all cases ensure that the spindle remains at 90 ( 10) to the belt surface. If no suitable location can be found to attach the spindle foot either to the chute or onto the conveyor structure the optional oft-set plates may be used as shown in Drg BS 017-B. Note that off-set plate so are not supplied as standard but must be ordered separately.
  4. Fix the spindles (6) firmly in position.
  5. Check that spindle nuts move freely.
  6. Locate Square Mount on spindles as shown and remove Clamp Plates from Square Mount (07).
  7. Check that Carrier Shaft End Pieces and Carrier Shaft Centre Piece are firmly bolted together (3 piece shaft 9).
  8. Position Carrier Shaft underneath the conveyor belt centrally with reference to belt edges and head pulley.
  9. Attach mounting clamp Plates to Carrier Shaft as shown.
    Note: Assemble washers and nuts finger tight only.
  10. Position Carrier Shaft and attached clamp plates on square mount as shown.
    Note: It may be necessary to adjust the location of the Square Mount on the spindle by means of the spindle Nuts so that the blades clear the belt surface.
  11. Lay a straight edge on the top face of the Carrier Shaft end and rotate the assembled Carrier Shaft and Clamp Plates in the slots in the Clamp Plates until the straight edge is parallel to the belt surface.
    Note: This step must be done carefully to ensure that the angle of the blade to the belt is correct.
  12. Tighten bolts and nuts. Do not over tighten.
  13. By means of Lock Nuts adjust the scraper towards the belt surface until all the blades contact the belt surface.
  14. Start the conveyor and check if all blades are moving freely and scraping in full contact with the belt surface.
  15. Check that all nuts and bolts are firmly fastened.
  16. At this stage adjust the scraper towards the belt by means of the spindle nuts until all blades are scraping satisfactorily.
  17. Check that the spindle lock nuts are firmly tightened.

E101-S Scraper - Standard Mount Installation Drawing
DRWG NO. BS 017-B