E501 Angle Plough
E501 Angle Plough
APPLICATIONS
- The Brelko Angle Plough is used as a substitute for the Brelko E40 1 V-Plough when the material scraped off the belt surface can only be discharged to one side of the belt.
FEATURES
- Unique track mounted scraping blade facilitates easy and quick blade change.
- Parallel dual-link mounting allows the plough to move freely thus maintaining contact with the belt.
- Can be assembled for left or right side discharge.
- Specially formulated PU blade ensure maximum blade life and minimum belt wear.
- Unique bolted assembly results in compact packaging for easy transport and installation.
- Scraping angle variable between 30 - 60deg.
- Can be mounted on the top, bottom or inside of the stringer.
E 501 ANGLE PLOUGH - PARTS LIST - REF. DRG. BS022
PART NO. ITEM CODE 1 Carrier 2/8.4 Specify Belt Width 2 Swivel Clamp 2/8.4.10 3 Top Plate L or R 2/8.4.11 4 Mounting 2/8.4.12 5 Link Arms 2/8.4.13 6 Blade 100mm
150mmSpecify Belt Width
Specify Belt WidthNOTE! Always quote scraper belt width.
E501 ANGLE PLOUGH - ASSEMBLY INSTRUCTIONS
1. Referring to the parts list (DRG BS022) check that the correct parts and quantities have been supplied for the model and belt width ordered.
2. Slide the blade (6) into the slotted carrier (1) and lock in a central position.
3. Loosely fit the two swivel clamps (2) over the carrier shaft. Fit the top plates (3 L & R) to the clamp plates.
4. Assemble the links (5) to the two side mounting frames.
5. Decide on the side (L or R) the plough must scrape to and swivel the blade/carrier assembly accordingly.
6. Connect the mountings and links (5) to the blade/carrier/swivel assembly.
7. The final angle of the blade and position of the mountings is determined by operating conditions and conveyor structure limitations.
E 501 ANGLE PLOUGH - INSTALLATION GUIDE - REF. DRG. PVO19
BELT WIDTH SIZE GROUP A 400
Size1
233-700
450
Size1
263-788
500
Size1
292-875
600
Size1
349-1048
750
Size1
438-1315
900
Size2
527-1582
1050
Size2
615-1845
1200
Size2
703-2108
1350
Size2
791-2372
1500
Size3
878-2635
1650
Size3
966-2898
1800
Size3
1055-3165
2100
Size3
1230-3691
INSTALLATION INSTRUCTIONS
1. The plough is intended for removing loose material on the inside of the return side of a conveyor belt ahead of take-ups, drive and tail pulleys, instead of a "V" plough (Brelko E401) when discharge can only be accepted to one side of the belt.
2. Refer to the assembly instruction parts list and DRG BS022 to confirm that all the necessary parts have been supplied and that the plough is correctly assembled.
Note: The plough can be altered to discharge to the left or right and the angle to the belt direction varied between 3Q0 to 600.
3. The return belt at the plough position must be flat and supported ahead and behind the plough.
4. With reference to the DRG's PVO1 9 select the most suitable position for the plough. The connecting links (5) should be near horizontal and the plough angle adjusted in the 300 to 600 range.
5. Mark out the mounting holes for the two mountings (4).
Note: The mountings may be fitted on top, inside or below the conveyor stringers to accommodate the position of the return belt and the conveyor decking, bracing etc..
6. Fix the mounting frame (4) firmly in position. Tapered washers may be required.
7. Ensure that the plough is securely linked to its frame and that the carrier/blade assembly (1,6) is central.
8. It may be necessary to trim the ends of the carrier/blade assembly (1,6) to clear the stringers during vertical movement. Ensure that at least a 50mm overlap both sides over the belt is maintained.
9. Securely lock the swivel clamp assembly (2,3) to the carrier (1).
10. Tighten the lock nuts holding the top plate (3) to the swivel clamp (2).
11. Check for free up and down movement of the plough and for good contact with the belt. Adjust if necessary.